Building layout & fire strategy
Floorplans, storeys, room uses, shared facilities and conversion or alteration information. Include any existing fire strategy and relevant common-parts or block arrangements.
BEFORE WE ATTEND · HMOS & SHARED HOUSING
A preparation checklist for landlords, managing agents and those responsible for fire safety in HMOs and shared housing.
Where practicable, send the information three working days before your visit. Missing a document? Tell us what you have.
01 / GATHER WHAT YOU HOLD
Send current, complete reports where available, including schedules and evidence of any remedial work.
This is a preparation checklist, not a requirement to commission every report listed. Let us know if an item is unavailable, not applicable or held by a landlord, managing agent or contractor.
Floorplans, storeys, room uses, shared facilities and conversion or alteration information. Include any existing fire strategy and relevant common-parts or block arrangements.
The current licence and conditions, where applicable, and relevant council or fire authority correspondence, notices, inspection findings and action deadlines.
The latest fire risk assessment, action plan and evidence of completed work, with outstanding actions and who is responsible for them.
Available system specification or installation records, servicing reports, routine test logs, and details of faults, false alarms and repairs.
Available functional and duration-test records, servicing reports and evidence of repairs or outstanding defects.
The full Electrical Installation Condition Report and schedules, with evidence of remedial work. Include relevant appliance inspection and maintenance records.
Relevant gas safety and appliance servicing reports where applicable, including remedial evidence and records for solid-fuel appliances where present.
Fire-door and communal-area check records, relevant existing compartmentation reports, repairs and servicing of fire equipment or other systems where provided.
Resident fire instructions, evacuation arrangements, routine management checks, fault reporting and support arrangements for anyone who may need help leaving safely.
02 / ARRANGE THE VISIT
We will confirm the scope and practical arrangements with you before attending.
Arrange for someone who understands the building, its day-to-day use and fire safety arrangements to meet the assessor. Include the Responsible Person or their representative where appropriate.
Arrange permission and suitable notice for access to common areas and any occupied rooms included in the agreed scope. Confirm who manages the property, which areas each party controls and any restrictions before the visit.
Occupants and households, shared or self-contained facilities, room uses, floor levels, management arrangements and any licence or authority requirements.
Your property: Licensing, housing arrangements and fire safety responsibilities depend on the property and its location. Tell us about its actual use, households and any licence conditions; we will confirm the agreed scope.
What to expect: a walk-through of accessible areas within the agreed scope, a discussion of your arrangements and a review of available evidence. A visual FRA does not replace system servicing, an EICR or a specialist intrusive survey.
03 / SHARE YOUR INFORMATION
Use the form below for property information. For reports and plans, use the private upload link supplied by SIUK for your property.
If you do not yet have an upload link, request one in the form or contact us. Upload links are arranged by our team after reviewing your details.
Contact the SIUK teamSTART WITH THE BUILDING
Complete one form per property. Required fields are marked *. If you are unsure about anything, tell us.
This form supports your assessment preparation. It does not confirm a booking or replace a Fire Risk Assessment.
A FEW USEFUL ANSWERS
Tell us. Provide any existing plans or fire safety handover information you hold. A formal fire strategy may not be available for every existing building; we will consider the information needed for your premises and scope.
Not automatically. Let us know early. We will review what is available and confirm whether anything further is needed beforehand. Missing evidence may need to be recorded as a limitation or followed up.
Yes. Tell us who holds them and arrange their provision with that party. For a shared building, clarify which areas and systems each organisation manages.
No. Receiving a document does not confirm its adequacy or that all defects have been resolved. The assessor will review the relevant information within the agreed scope.
KEEP THE CHECKLIST TO HAND
Download the guide, share it with those who manage the property and gather the records you already hold.