Safety Inspectors UK Ltd

FLOORPLANS · EVACUATION DIAGRAMS · ASSET MAPPING

FIRE
FLOORPLANS.

From building layout
to fire evacuation plan.

We survey your premises, create clear floorplans and develop fire evacuation diagrams for display. Book the full service or just the plans you need.

Available as a standalone service or alongside an agreed fire risk assessment.

Ricky Nelson using a phone beside a fire extinguisher, with a digital location marker and report overlay
DIGITAL CAPTURE · LOCATION MAPPINGCapture the layout. Locate the asset. Link the report.

CHOOSE THE OUTPUT YOU NEED

One building.
Different uses.

A basic layout, an assessment findings plan and a displayed evacuation diagram serve different purposes. We agree the content and presentation with you.

01 / UNDERSTAND

Building layouts

Clear 2D plans showing rooms and circulation, with optional 3D views to help people understand the space.

02 / LOCATE

Findings & asset plans

Numbered locations that connect equipment or assessment findings with photographs, records and actions.

03 / COMMUNICATE

Evacuation diagrams

Develop the floorplan into a clear display showing the agreed escape routes and fire-action information.

See how we develop the plan ↗

Digital and printable formats, drawing detail and any future updates are agreed in your quote. Layouts and diagrams support your arrangements; they do not replace a fire risk assessment.

FROM THE SURVEY TO THE FINISHED DISPLAY

Floorplans first.
Evacuation plans next.

Need the plan people see on the wall? We can take your building from a digital survey through to a finished fire evacuation diagram, or develop suitable drawings you already have.

  1. 01 / CAPTURE

    Survey the building

    Record the rooms, corridors, stairs and exits, and check the layout on site.

  2. 02 / CREATE

    Prepare the floorplan

    Turn the survey into a clear base drawing that represents your premises.

  3. 03 / DEVELOP

    Add the evacuation information

    Develop a clear diagram for the agreed display position and evacuation arrangements.

FINISHED EVACUATION PLAN · DEMONSTRATIONOpen full-size plan ↗
Example fire evacuation plan showing escape routes, exits, fire-safety equipment and a symbol key
Example from our evacuation-plan work. Client branding and site details have been removed. Your plan can carry your own logo and premises information.
SEE THE WORK IN PRACTICEOur Sutton floorplan and fire escape-plan project. Watch on YouTube ↗

THE FINISHED EVACUATION DIAGRAM

Show people where they are.
Make the way out clear.

We agree the information needed for each display, which can include:

  • A clear "You are here" position.
  • Escape routes, stairs and final exits.
  • Relevant fire-safety equipment and a simple key.
  • The assembly point and agreed fire-action instructions.

Each diagram is prepared for its location and your building's evacuation arrangements. We agree the digital or printable format with you.

Discuss your evacuation plans ↗

Commission floorplans and evacuation diagrams together, or ask us to develop existing drawings. FRA findings plans and detailed asset mapping are also available as separately agreed outputs.

A USEFUL ADDITION TO YOUR ASSESSMENT

Turn “where is it?”
into “there it is.”

Help managers find the issue and organise the work.

Where agreed alongside an FRA, we can reference findings on a building plan and connect them with the relevant photographs and actions.

The assessment explains the risk and what needs doing. The plan helps you locate it. You can also commission plans separately if you already have an assessment.

See how plans support an FRA ↗
Safety Inspectors UK building report with numbered fire alarm devices marked on a floorplan
Example of our location-linked building-report format.

FROM LAYOUT TO WORKING RECORD

Know where
your equipment is.

We can plot and reference equipment to help connect the building with inspection, testing and maintenance records.

Fire alarm equipment
Locate detectors, manual call points, sounders and control points to support testing, fault tracing and maintenance.
Emergency lighting
Reference emergency lights so inspection and test records can be connected with the correct location.
Fire extinguishers
Record extinguisher types and positions to support servicing, routine checks and clearer site records.
Asset tracking
Connect numbered assets with registers and records of checks, faults and follow-up actions.
Illustrative floorplan linking extinguisher EXT-01, emergency light EL-01 and call point MCP-01 to matching asset-register entries
An extinguisher, emergency light and call point share the same references on the plan and in the register. Illustrative example. View full-size asset map ↗

Mapped references can support an asset register and wider systems for tracking checks, faults and actions. Ongoing updates and digital tracking are scoped separately. For continuing help with your arrangements, explore our retained safety support.

CAPTURE · CREATE · DEVELOP

From your premises
to a usable plan.

For offices, warehouses, retail, motor trade, industrial premises and multi-site organisations.

  1. 01

    Capture the layout

    We survey the accessible premises using digital tools, including LiDAR where suitable, and check the information needed.

  2. 02

    Create the drawing

    Develop the base layout and confirm the required detail, format and purpose.

  3. 03

    Add useful information

    Include agreed findings, assets or evacuation information, with a clear basis for later updates.

BEFORE YOU BOOK

The right plan
for the purpose.

Can we book floorplans without an FRA?

Yes. Floorplans are available as a standalone service. Tell us whether you need a basic layout, evacuation diagrams, asset mapping or a combination.

Can you work with existing drawings?

Share what you have. We will review whether it is suitable and what site checks, amendments or new capture are required.

Are these measured architectural or fire-strategy drawings?

Our service provides practical building layouts and agreed fire-safety information. Architectural measured surveys, design certification and fire-strategy work require their own scope and are not automatically included.

Can the plans be updated later?

Yes. We can quote for updates when the layout, equipment or evacuation arrangements change. Keep the information under review so staff are using the current version.

LET’S MAKE YOUR BUILDING CLEARER

FLOORPLANS THAT
HELP YOU MANAGE.

Tell us the address, approximate size and what you want the plans to show. Include any existing drawings and whether you need an FRA.

Call usEmail us WhatsApp us